Skip to main content

Additional dwelling units in Chatham-Kent

Urban Structures Construction builds additional residential units (ARUs) throughout Chatham and Chatham-Kent. You may know them as ADUs, in-law suites, second suites, or basement apartments. Whatever you call it, the idea is the same: a self-contained living space with its own entrance, kitchen, and bathroom, either inside your home, attached to it, or as a separate building. We've spent 22 years in residential construction, and we handle these projects from the first walkthrough to the final inspection.

Our ADU solutions

Whether you want to build passive rental income, keep aging parents close, or give adult children an independent home, we design and build compliant secondary dwelling units tailored to your lot.

Basement apartments

Convert unfinished or dated lower levels into fully compliant, self-contained rental suites or in-law apartments complete with separate entrances, soundproofing, and full amenities.

Garage & upper-floor conversions

Repurpose detached garages, loft spaces, or upper levels into bright, self-sufficient secondary suites engineered to meet all fire, structural, and insulation standards.

Accessible in-law suites

Design custom multi-generational suites with barrier-free bathrooms, wide doorways, and private kitchenettes for comfortable, independent living close to family.

What We Can Build

  • Basement apartments: converting unfinished or partly finished basements into legal second suites

  • In-law suites: private, accessible spaces for family members

  • Garage or upper-floor conversions: turning existing structures into a separate living units

  • Rental units: built to Ontario's building code for a legal, insurable rental

What an ADU Needs to Be Legal in Ontario

This is the part most homeowners don't know going in. A legal additional residential unit generally needs:

  • Its own entrance

  • A kitchen, bathroom, and sleeping area for each unit

  • Smoke alarms and carbon monoxide alarms interconnected where code requires

  • Separate or adequately sized heating, electrical, and plumbing

  • Enough parking as required by Chatham-Kent's zoning bylaw

  • Building permits and passing inspections

Rules also differ depending on whether the unit is inside your house, attached, or detached. We tell you what applies to your property before you commit to anything.

Our Process

  1. Feasibility check: We look at your property, zoning, and the space you have before you spend money on plans.

  2. Design and estimate: You get a written scope and price covering construction, plus a clear list of what you'll need from your municipality.

  3. Permits: We explain the permit process and handle or help with  the paperwork.

  4. Construction: Framing, insulation, drywall, electrical and plumbing through licensed trades, and finishing, all with one point of contact.

  5. Inspections and completion: We walk you through everything and make sure the unit passes.

Why homeowners trust Urban Structures Construction

Backed by over 22 years of residential construction experience in Chatham-Kent, we deliver transparent, stress-free secondary unit builds. You get detailed written estimates, a single point of contact from start to finish, and our solid 2-year warranty on all workmanship.

Turnkey permit & bylaw handling

Navigating Ontario's building code and Chatham-Kent zoning bylaws can be daunting. We handle the entire process—including zoning reviews, architectural drawings, engineering, and municipal building inspections—ensuring your unit is 100% legal, safe, and insurable.

Quality construction built to last

Every unit we build receives the same attention to detail as our custom home projects. From robust fire separation and dedicated HVAC to durable, stylish finishes, we build spaces that maximize long-term rental value and family comfort.

Frequently asked questions

Can I add an ADU to my property in Chatham-Kent?

Ontario's Planning Act requires municipalities to allow additional residential units in most areas, but the details — how many units, parking, setbacks, and size limits — are set by Chatham-Kent's zoning bylaw. We help you confirm what's allowed on your property before you commit.

How much does it cost to build an ADU?

Costs vary widely depending on whether you're finishing a basement, converting a garage, or building from scratch. A basement conversion is usually the most affordable route. You get a written estimate after we look at your property.

How long does it take?

Permit approvals take time before construction can start. Construction itself usually runs 3-6 months depending on the project. We give you a realistic schedule up front.

Can I rent it out?

Yes. A unit built with permits and passing inspections can generally be rented. We build to code so the unit is legal and insurable — not a hidden apartment that causes problems later.

Do you handle the permits?

We handle the permit process from start to finish, coordinating drawings, submitting applications, and working with the municipality to secure the approvals your ADU needs. We also coordinate required inspections throughout construction, keeping the process straightforward and keeping you informed along the way.

Ready to Build Your Additional Residential Unit?

Tell us about your property and what you have in mind. We'll take a look and give you a free, honest assessment of what's possible.